Skip to Content

Installation of BMS system by point

SR 240.00 SR 240.00

  • Installation includes:

Specifications

Installation includes: Third Fix Only: time and material required for the installation & termination of BMS senors/Device, Second & Third Fix Only: Third fix in addition to time and material required for pulling BMS control cable, First, Second & Third Fix: 2nd and 3rd Fix in addition to time and material required for installation of BMS point route PVC/EMT/Flexible pipe